The Lucius Oil Export Pipeline is an 18" pipeline from the new Lucius Development in Keathley Canyon (KC) Area Block 875 to the South Marsh Island (SMI) Area Block 205 Platform. The system is designed for ANSI 1500 pressure rating. The pipeline is comprised of three sections.
-
South section: Newly laid 71 mile pipeline with a water depth range of 7,025 to 5,300 feet. Two inline wye assemblies are included for future tie-ins.
-
Mid section: Utilized a portion of existing 18" Phoenix pipeline approximately 48 miles long with a water depth range of 5,300 to 2,395 feet.
-
North section: Newly laid 26 mile pipeline with a water depth range of 2,395 to 445feet.
In addition, a new 4000 foot long 6" fuel gas pipeline and riser will connect the Platform in SMI 205 to a hot tap on the 30" Garden Banks gas pipeline.
CTI's project management and engineering responsibilities included:
-
South section: Newly laid 71 mile pipeline with a water depth range of 7,025 to 5,300 feet. Two inline wye assemblies are included for future tie-ins.
-
Mid section: Utilized a portion of existing 18" Phoenix pipeline approximately 48 miles long with a water depth range of 5,300 to 2,395 feet.
-
North section: Newly laid 26 mile pipeline with a water depth range of 2,395 to 445feet.