The Anaconda Pipeline Extension is a 46.25-mi, 20" OD pipeline from a subsea tie-in EI - 371 to the Manta Ray Offshore Gathering Co., LLC's platform in SS-207 in water depths of 428 feet to 101 feet. The Anaconda Pipeline Extension is a gas pipeline from facilities upstream including Marco Polo TLP (GC-608), Constitution SPAR (GC-680) and Helix/Phoenix FPU (GC-237).
CTI engineering and project management responsibilities for this project included the following:
Performed detailed engineering design for the pipeline including fabrication and installation drawings
-
Provided drafting for construction drawings
-
Assisted with MMS permitting
-
Reviewed and advised on Contractor's installation procedures
-
Provided QA/QC inspection at the anode manufacturer's facility on the pipelay vessel
-
Developed a Flooding, Hydrostatic Testing, Dewatering and Commissioning Procedure