The Leviathan Field, an estimated 16 trillion cubic feet of natural gas reservoir, is located in the Levantine basin approximately 135Km offshore Hifa, Israel in 1700M water depth. Nobel energy is developing subsea transportation system connecting the Leviathan field to Israel.
The early production system will consist of connecting four (4) infield flowlines from each well to an FPSO. The gas will then be exported through export pipelines to Israel. The dual Israel export lines will be connected via a subsea tie-in to the existing INGL 30" system. The early production system will accommodate further development of the Leviathan field by allowing future well drilling activity as well as enabling tie-in of future gas gathering systems to the export pipelines system.
CTI's project management and conceptual engineering responsibilities included:
-
Develop project design basis
-
Assist with subsea architecture
-
Pipeline route selection
-
Design of the export lines
-
Design of the infield gas gathering system
-
Prepare RFQ Package for Hazard Survey and Pipeline Installation
-
Provide drafting services
-
Review and development of project specifications
-
Provided project and construction management support
-
Coordinate Seismic Survey and Engineering