The Trintes Field is located approximately five (5) miles off the eastern coast of Trinidad, in approximately 85 feet of water. The Trintes Field consists of four (4) platforms and various pipelines. The field is operated by Bayfield Energy. Bayfield has decided to upgrade the topside facilities, drill additional wells, revise the pipeline field geometry, and install a new infield and a new export pipeline to shore.
The Infield Pipeline, approximately 1,600 feet in length, will replace an existing pipeline between Trintes "C" and Trintes "B" platforms.
The Export Pipeline from Trintes "D" to an onshore terminal, approximately 33,000 feet in length, will replace an existing pipeline from Trintes "A" to the terminal.
CTI engineering and project management responsibilities for this project include the following:
-
Provide project management, interface management, and project controls services for the design and bidding period
-
Perform the detailed design and drafting services for the infield pipeline and risers
-
Perform the detailed design and drafting services for the export pipeline, including the HDD shore approach
-
Preparation of the necessary permit applications to the Trinidad Government for the execution of the work
-
Provide materials management for the project, including the preparation, receipt, evaluation, and award recommendation of RFQ packages for the pressure related permanent materials
-
Provide construction management for the project, including the preparation, receipt, evaluation and award recommendation of the RFQ packages for:
-
Seismic Study and Seismic Engineering
-
Hazard and Geotechnical Survey
-
Installation of the Infield Pipeline
-
Installation of the Export Pipeline
-
Provide project engineering and construction management support during the project execution